Design, detailing, and construction of the access roads, foundations, crane pads, buildings, and other civil infrastructure required for the installation and commissioning of all equipment and facilities associated with the 185MW wind turbine generating station. This includes 1 buoyant foundation for turbine 42, 25 non-buoyant foundations for GE 2.75MW turbines, 35 non-buoyant foundations for GE 3.2MW turbines, drainage for 60 non-buoyancy foundations.
Trenching excavation
Trenching excavation
Foundation prep
Foundation prep
Site laydown
Site laydown
Trenching excavation
Trenching excavation
1/5
MEIKLE WIND FARM