Installation of a new 25kV feeder from the Fort St. John Substation to offload FJN 25F64 by constructing a 25kV line to the Taylor Substation. This includes crossings at the intersection of 86th Street and Alaska Highway, the intersection of the East Bypass and Alaska Highway, the Canfor Transmission Line, Swanson Lumber, and 255th Road and Baldonnel.

1/5

FORT ST. JOHN DUCT BANKS